Solder 2 wire offcuts to either side of the 3v9 zener, these will be used to attach meter probes for the first test.
Solder the coil wires to these pads on the top left of the underside:
Connect a multimeter on a low volts range to the 2 wire offcuts, then move the pcb/coil assembly slowly over the top of the base coil, about 2 inches above it. Watch the meter reading to make sure it doesn't rise above 4.5V - it should reach around 3.9-4.2V and stabilise. 1-2 of the LEDs may light up randomly as well.